Argos Promotion Process

Summary

A guide on the Argos promotion process.

Body

Below are the instructions for promoting Evisions Argos Objects (Folders, DataBlocks, Dashboards, Reports and Schedules) from Argos Test to Argos Production. Specifics regarding “Schedule Only” changes to Production are provided further in these instructions.

Only users with DataBlock Designer (or Administrator) rights can perform the Export necessary for promoting an Argos Object. Folders and DataBlocks can be exported on their own but Reports and Schedules are exported only by exporting the associated DataBlock and including the Report (and Schedule) in the export.

Warning: If Argos Objects are modified directly in Production (without exporting from Test), it is the Data Block Designer’s and Report Writer’s responsibility to insure the associated Argos Object is updated in Test.

If an Export of an Argos Object is requested, UTS is not responsible if the Production version is over-written. When UTS Imports the objects, if they already exist in Production, the system will automatically make a copy of the object and append a number on the end. It will be the Report Writer’s responsibility to remove any reports that are not needed.

Who is Eligible?

Active Faculty or Staff

UTS Argos Administrator

Download Export and Import Into Argos Production

  1. Download the Export File from the Footprints ticket.
  2. Import it into the "Z_ModelOffice" folder in Argos Production.
  3. Note any instructions for the import [an entire folder or single DataBlock(s) ]

Review the SQL for Standards, Best Practices and Naming Conventions

  1. The SQL needs to follow UTS Standards and Argos Best Practices.
  2. These are listed in the Argos Reporting Technical Section.
  3. If there are no issues, continue with the next steps. Otherwise, update the ticket with instructions. Upon receiving a new export file, start at previous Section again.

Copy or Import the Object(s) to the specified Group Folder

  1. If any objects already existed, they will be automatically copied to a file appended with a number.
  2. If the Export is to replace an existing Folder, you can delete the existing folder and then either copy or import to that Group/Folder.
  3. Make sure any DataBlock associated with the import has an ADO Connection assigned. This should have been done in the exported file.
  4. Remove any left over Folders or DataBlocks from the Z_ModelOffice folder.

Update/Close the Argos Form and Footprints Ticket

1. Update/Resolve the UTS Footprint Ticket with the following comment:

  • "Marking Resolved. DataBlock(s) and/or Folders promoted per instructions."

Request to Update Schedule Only in Production (Future Phase)

UTS Argos Administrator

  1. Log into Argos Production.
    1. Create / Change the Schedule per the instruction on the request.
    2. Ensure the schedule is enabled and all tasks match the request.
  2. Update/Close the “Argos – Promotion Request” form
  3.  Update/Resolve the UTS Footprint Ticket

Note: As we learn more about the Evisions Argos product, these standards and best practices will grow and be revised to suit our environment more closely.

Additional Support

  • OU Technology Center
  • 44 Oakland Center
  • Rochester, MI 48309-4479
  • (248) 370-4357
  • Office Hours: M-F 8:00am - 5:00pm

Details

Details

Article ID: 101
Created
Fri 3/28/25 1:51 PM
Modified
Wed 4/9/25 10:10 AM

Related Articles

Related Articles (4)

An explanation of how to obtain access to Argos and the requirements need for various roles.
A guide on how to create an Argos ADO connection.
A guide on how to request to promote Argos objects to production.
An explanation of Argos Reporting and a guide on what is required.

Related Services / Offerings

Related Services / Offerings (1)

Comprehensive reporting and data access solutions using Argos for Oakland University departments and business areas.